INFORMER Q2 2024 Edition
Your copy of the #15 iNFORMER Magazine, covers everything that’s happened at Inforce for the past quarter!
Download your copy and learn:
- The floor design and optimisation of a large steel fabrication facility in Queensland.
- Future proofing 13,000m2 of floor slab and pavement slabs in the heart of wine country.
- Insights into NCAT and MNROAD test tracks and the benefits of adopting ACE Aramid fiber in the design.